The obligations first
| Regulator / regime | Who it binds | The record it wants | Headline number |
|---|---|---|---|
| BOS 93 (BOBS) + DWA discharge permits | Anyone discharging wastewater to sewer, watercourse or open ground | Discharge quality against the standard's limit table; permit conditions set by the Department of Water Affairs | pH 6.0–9.0, BOD 30, COD 75, TSS 25 mg/L (2004 values; the current edition is BOS 93:2021) — discharge compliance |
| WUC — national utility | Every town, village scheme and bulk customer | Zone balances, prepaid vend-versus-flow, wellfield abstraction | NRW ~45% (WUC, Aug 2026); 35,000 smart prepaid meters in Gaborone — non-revenue water |
| Environmental Assessment Act 2011 (DEA) | Projects with an approved EIA and environmental management plan | The monitoring the plan committed to — groundwater, dust, effluent — as a continuous record rather than an annual visit | remote site monitoring |
| Mines, Quarries, Works and Machinery Act | Mine operators and the Department of Mines inspectorate | Machinery, ventilation and safety records the inspector can ask for | mining condition monitoring |
| LITS (Department of Veterinary Services) | Cattle owners, feedlots, abattoirs exporting beef | Individual animal identity by RFID ear tag, feeding the central traceability database that keeps EU market access | RFID ear tags since 2013 — RFID across Africa |
| BPC load shedding | Every grid-connected site | Not a regulation — a design constraint: scheduled shedding windows, and gensets that must be proven ready | generator and power monitoring |
WUC zones and the Gaborone prepaid scheme
Botswana runs its water through one utility, which makes the national loss figure — around 45% of production lost, by WUC's August 2026 reporting — a single organisation's balance sheet. The Gaborone prepaid programme puts 35,000 smart meters at the customer end; the measurement that turns it into a loss-reduction tool is at the other end: bulk input per zone against the sum of vends, night flow per district, and an independent reading of the meters themselves. Pages: non-revenue water in Botswana, prepaid meter verification.
Wellfields, village supply and the North-South Carrier
The country's water moves long distances: wellfields in the north and east feed the North-South Carrier towards the population in the south-east, and village schemes hang off boreholes and small reservoirs along the way. Level, flow, pressure and pump status every few minutes, with dry-run protection at the borehole and pressure profiles along the pipeline, is the record that replaces the weekly drive. Pages: water telemetry, remote site monitoring.
Boreholes on cattle posts, farms and lodges
Off the A1 corridor the borehole is the site: a solar pump, a tank, cattle or guests depending on it, and nobody within a hundred kilometres. Tank level and pump current, solar-powered, on private LoRaWAN back to the nearest 4G point, report the empty tank before the animals do. The same node design serves a game farm water point and a lodge's supply.
Diamond mines — Jwaneng, Orapa, Karowe
Botswana's large diamond operations are open pits with underground extensions under way, and their monitoring list is the open-pit list: pit dewatering and groundwater levels against the environmental plan, slope and tailings instrumentation, the power interface between BPC supply and site generation, and the rotating assets — crushers, mills, conveyors, pumps — whose spares come up the road from Johannesburg. Conveyors and pumps are the assets that fail most often and cost the least to instrument. Page: mining condition monitoring in Botswana.
Copper in the Kalahari — Khoemacau, Motheo
The Kalahari Copper Belt in the north-west put concentrators where there was previously no grid, no road worth the name and no technician. Everything the site does is measured against the cost of getting somebody there: mill and crusher vibration, slurry-pump temperature, concentrate flow, power-plant load, water balance for a plant that has to make its own supply. Local buffering and a link that tolerates days without a visit are the design rules. Pages: mining condition monitoring in Botswana; our Africa mine monitoring map puts the Botswana row beside its neighbours.
Coal at Morupule — mine and power station
A coal mine feeding a power station next door has two conveyor systems, a crushing plant and a set of mills whose availability is the country's electricity supply. Belt condition, drive vibration, bearing temperature and stockpile level, continuously, are the difference between a planned belt change and an unplanned national one.
Beef — feedlots, BMC abattoirs, cold chain, LITS
Botswana's beef exports run on traceability: every animal carries an RFID ear tag under the Livestock Identification and Trace-back System, and the abattoirs in Lobatse and Francistown depend on cold rooms that must stay cold through the shedding window. Continuous temperature logging with alarms, door and compressor state, genset readiness for the cold chain — and, for the feedlot and the yard, the same RFID reader classes that read the ear tags read trailers, tools and equipment at the gate. Page: generator and power monitoring; regional context in our Africa RFID applications map.
Beverage and FMCG lines in Gaborone
The Gaborone industrial areas host the filling, packing and processing lines where micro-stops and changeovers are the ordinary loss physics and a scheduled outage is the extraordinary one. Count-based OEE at the constraint attributes the first; mains presence and genset state beside the counts attribute the second. Our named client relationship in this sector extends to Botswana. Pages: OEE and production monitoring, industrial IoT in Botswana.
Factories and works discharging under BOS 93
BOS 93 is the limit table a Botswana discharge is judged against — pH 6.0–9.0, BOD 30 mg/L, COD 75 mg/L, suspended solids 25 mg/L, faecal coliforms 1,000 per 100 mL in the 2004 values reproduced in the regional handbook; the current 2021 edition is sold by BOBS — and the Department of Water Affairs issues the permit. Flow, pH and a COD surrogate at the outfall, continuously, catch the shock load before it becomes a permit finding. Page: effluent discharge compliance.
Generator sites, telecom shelters and BPC shedding
When BPC schedules shedding, the genset is a production asset, and on an unattended site fuel is one of the largest operating costs. Mains presence, genset state, fuel level and run-hours, buffered locally and reported over 4G or LoRaWAN, explain the fuel bill, catch the theft and prove the set ready before the window. Page: generator and power monitoring in Botswana.
Safari lodges and Okavango camps
A camp in the Delta is an off-grid industrial site with guests: solar and battery, a genset, boreholes, cold rooms and a sewage plant whose discharge is judged in a wetland. Battery state of charge, genset fuel, water level and cold-room temperature on one screen, reported over whatever link the camp has, replace the radio call that comes too late. Page: remote site monitoring.
Instrumented plant — reading what is already there
Most Botswana plants already have the sensors: 4–20 mA transmitters, Modbus meters, a PLC with spare capacity. The fastest project reads those into a dashboard and an alarm path without replacing anything, and adds sensors only where the record has a gap. Page: industrial IoT in Botswana.
The map on one table
| Site type | First measurement | Who reads the record | Failure it prevents |
|---|---|---|---|
| WUC zone / prepaid scheme | Bulk input vs zone vs sum-of-vends | WUC, customers | 45% losses with no district to point at |
| Wellfield / North-South Carrier | Abstraction + level + line pressure | WUC operations, DEA conditions | Dry-running pumps; a burst found days later |
| Cattle-post / farm / lodge borehole | Tank level + pump current, solar | Owner, manager | Empty tank discovered by the herd |
| Diamond open pit | Dewatering + groundwater + conveyor/pump vibration | Mine engineering, DEA, Department of Mines | Unplanned stoppage with a three-week spare |
| Kalahari copper concentrator | Mill/crusher vibration + power-plant load + water balance | Operations, finance | A failure nobody can reach for two days |
| Coal mine / power station feed | Belt condition + drive vibration + stockpile level | Mine and station operations | Belt failure that becomes a supply event |
| Abattoir / cold chain | Cold-room temperature + compressor + genset readiness | Quality, export certification | A shedding window that spoils a consignment |
| Beverage / FMCG line | Counts + run state + mains presence | Plant management | Outages blamed on crews |
| Factory outfall (BOS 93) | Flow + pH + COD surrogate | DWA (permit), BOBS standard | Limit breach between samples |
| Genset / telecom / unattended site | Mains + genset state + fuel | Operations, finance | Fuel theft; a set that fails when the window opens |
| Safari lodge / Delta camp | Battery SoC + genset fuel + water + cold room | Camp management | Dark camp, warm fridge, guests awake |
| Instrumented plant (any) | Existing 4–20 mA and Modbus, read not replaced | Engineering | Rip-and-replace quotes |
How we deliver in Botswana: Gaborone is a few hours by road from our Johannesburg engineering base — the shortest support line of any market we serve. Remote assessment, hardware pre-configured and tested in Johannesburg, road freight rather than air cargo, installation by your technicians or a local partner under live remote guidance, 4G along the A1 corridor and private LoRaWAN beyond it, with solar power budgets and local buffering sized for months between visits. Start with the row whose reader has a standard number — or the genset, which touches every row when the shedding window opens.